Skip to main content

Listing broker remarks

Completely renovated home. The main two levels feature three bedrooms, a full bath, and a half bath. The kitchen is equipped with stainless steel appliances, granite countertops, a built-in microwave, and a stackable washer and dryer. The finished walk-out basement currently serves as a guest suite and offers significant potential for conversion into an in-law suite or ADU, subject to city approval. This suite includes a bedroom area, living room area, full bath, and a kitchen area (currently without a stove). It also features its own stackable washer and dryer and a dedicated heat pump minisplit for heating and cooling. The entire property is fully insulated and includes several modern upgrades, such as new flooring, remodeled bathrooms, new light fixtures, and a brand-new composite deck. The master bedroom is also equipped with a minisplit. Centrally located. Enjoy easy access to Downtown, Union Station, Shrewsbury street, and a host of dining options, all within walking distance.— Maximus Seale

Key details

  • 2,100 sq ft
  • 5,359 lot sq ft
  • 3 beds
  • 2.5 baths
  • 2006 built
  • $209 / sq ft
  • $4,651 2025 taxes
MLS #
7⁠3⁠5⁠3⁠3⁠0⁠3⁠4⁠
Last updated
Address
53-B Prospect St
Town
Worcester, MA
ZIP
01605
Deed (Bk/Pg)
39447 / 147

Map

Neighborhood: Worcester

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.