Skip to main content

Listing broker remarks

**Offer deadline Monday 6/15 @ 8pm** Lovely colonial built with quality and charm in desirable Burncoat location! Remodeled kitchen with stainless steel appliances, granite countertops, tile backsplash, penninsula for casual dining, and additional dining area with built in china cabinet. Sunny sliding door leads to outdoor deck overlooking the tranquil backyard filled with mature plantings and trees. Living room has beamed ceiling, wood buring fireplace insert and leads to a convenient playroom or office space with pocket door. Side entryway leads to charming, covered side porch that is perfect for outdoor dining. Half bath off the kitchen completes the main level. Upstairs you will find three comfortable bedrooms with ample closets and full remodeled bath with tub and shower. Hardwood floors throughout! Commuters will enjoy quick access to major routes and downtown Worcester. Plenty of shopping and attractions nearby! Get ready to enjoy all this lovely home has to offer!— RE/MAX Vision

Key details

  • 1,496 sq ft
  • 3 beds
  • 1.5 baths
  • 1926 built
  • $324 / sq ft
MLS #
7⁠3⁠5⁠3⁠3⁠9⁠4⁠4⁠
Last updated
Address
46 North Parkway
Town
Worcester, MA
ZIP
01605
Deed (Bk/Pg)
54000 / 203

Map

Neighborhood: Worcester

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.