Skip to main content

Listing broker remarks

Contemporary styled young home, set in a desirable neighborhood, just minutes to major routes, shopping, UMass, Polar Park and the train station. Enjoy two oversized bedrooms, thanks to a custom floor plan modification at build, while still offering the flexibility to convert back to a three bedroom if needed. The primary bedroom has a huge custom walk-in closet (11x8). The living room features a beautiful propane gas fireplace (2022) with custom floor to ceiling surround. Lower level family room with Luxury Vinyl Plank flooring. All new stainless kitchen appliances (2024). Large deck (20x14) overlooking gardens and patio with a firepit. Two-zoned forced hot water baseboard heat and three zone heat and a/c mini splits (2017). New furnace, 50 gallon hot water heater and roof ~ 50 year shingle transferable warrantee. See attached building plans— RE/MAX Vision

Open Houses

Key details

  • 1,794 sq ft
  • 7,950 lot sq ft
  • 2 beds
  • 2 baths
  • 2004 built
  • $300 / sq ft
  • $5,933 2025 taxes
MLS #
7⁠3⁠5⁠3⁠6⁠0⁠7⁠4⁠
Last updated
Address
15 Primrose Street
Town
Worcester, MA
ZIP
01604
Deed (Bk/Pg)
34327 / 205

Map

Neighborhood: Worcester

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.