Skip to main content

Listing broker remarks

Beautifully crafted NEW CONSTRUCTION in Westwood MA, offers an open floor plan, generous rooms, and a thoughtful custom design. Light-filled chef’s kitchen w oversized island, custom cabinetry, high-end appliances, and large walk-in pantry, flowing seamlessly into integrated dining area and spacious family room w gas fireplace. Generous mudroom with half bath, and First-floor en-suite bedroom provides ideal flexibility for guests, or office. 4 bedrooms upstairs, including a light filled primary suite with generous walk-in closet and spa-like bath. Finished lower level adds approximately 1,100 sf w full bath, perfect for media room, gym, or playroom. 2-car garage, designer finishes, and energy-efficient systems throughout. This home checks all the boxes!— Artemis Realty

Key details

  • sold
  • 5,402 sq ft
  • 13,534 lot sq ft
  • 5 beds
  • 5.5 baths
  • 2026 built
  • $471 / sq ft
MLS #
7⁠3⁠5⁠0⁠6⁠6⁠2⁠0⁠
Last updated
Address
48 Sunrise Rd
Town
Westwood, MA
ZIP
02090
Sold for
$2,549,000
Deed (Bk/Pg)
4742 / 250

Map

Neighborhood: Westwood

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.