Skip to main content

Listing broker remarks

This sophisticated New England farmhouse is set on Westwood’s iconic Summer Street. Recently completed, it offers 4,700 square feet of living space that blends classic detail with tasteful contemporary design. The gourmet kitchen is a culinary enthusiast’s dream, featuring granite countertops and a substantial island ideal for both preparation and casual dining. It opens to a fireplaced living room and a gracious dining room, with access to a deck overlooking the beautiful 2.5-acre lot. Upstairs, the primary suite features walk-in closets and a superbly appointed bath. There are three additional bedrooms, two baths (one en suite) and a laundry room. The walkout lower level includes a fifth bedroom, full bath, and a spacious family room opening to a patio. Offering access to Westwood's excellent public schools and nearby top-notch private schools and just one mile from Route 95 with access to Boston /Logan, this property has it all!— LandVest, Inc.

Key details

  • 4,700 sq ft
  • 2.51 acres
  • 5 beds
  • 4.5 baths
  • 2025 built
  • $530 / sq ft
MLS #
7⁠3⁠2⁠1⁠9⁠8⁠8⁠8⁠
Last updated
Address
298 Summer Street
Town
Westwood, MA
ZIP
02090
Deed (Bk/Pg)
1002 / 422

Map

Neighborhood: Westwood

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.