Skip to main content

Listing broker remarks

Welcome to 3 Diane Way, a beautifully designed new construction home offering modern comfort, thoughtful craftsmanship, and a serene setting. Situated on a generous 1.4-acre corner lot, this home is available for reservation prior to completion and is scheduled for delivery at the end of summer 2026. is scheduled for completion at the end of July 2026. The layout features 3 bedrooms, 2 full bathrooms, and a spacious 2-car garage. An open-concept design is complemented by a designer kitchen with premium stainless steel appliances, ideal for both everyday living and entertaining. The primary suite offers a tray ceiling, custom walk-in closet, and private bath. A full walk-out basement provides excellent potential for future living space, a home gym, or additional storage. Built to the builder’s design with some buyer selections, this home ensures a cohesive and well-executed finish throughout. Enjoy the privacy of a corner lot settled in this desirable neighborhood in Westport— Botelho Agency LLC

Key details

  • 2,634 sq ft
  • 1.38 acres
  • 3 beds
  • 2 baths
  • 2026 built
  • $360 / sq ft
  • $1,335 2025 taxes
MLS #
7⁠3⁠5⁠0⁠6⁠0⁠5⁠4⁠
Last updated
Address
3 Diane Way
Town
Westport, MA
ZIP
02790
Deed (Bk/Pg)
14857 / 110

Map

Neighborhood: Westport

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.