Skip to main content

Listing broker remarks

Nestled into a picturesque hillside with stunning views of Mt. Watatic, this beautiful 2020 post-and-beam home offers modern elegance and exceptional privacy on a 2.86-acre lot. With easy access to Route 2, it features single-level open-concept living bathed in natural light—perfect for everyday comfort and entertaining.The finished basement includes a private in-law apartment with separate entrance, ideal for family, guests, or income potential. Outside, enjoy direct access to the Mid-State Trail and Leominster State Forest, plus cleared level areas ready for a large garden. The space above the garage can easily become a luxurious primary suite or family retreat with a fireplace.Built with quality craftsmanship and white oak hardwood throughout, this home perfectly blends modern living, natural beauty, and endless potential in a serene, private setting.— Prospective Realty INC

Key details

  • 2,064 sq ft
  • 2.87 acres
  • 3 beds
  • 3 baths
  • 2020 built
  • $382 / sq ft
  • $5,798 2025 taxes
MLS #
7⁠3⁠5⁠3⁠1⁠6⁠3⁠0⁠
Last updated
Address
9 Hanks Hill Road
Town
Westminster, MA
ZIP
01473
Deed (Bk/Pg)
7572 / 281

Map

Neighborhood: Westminster

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.