Skip to main content

Listing broker remarks

NEW Price & NEWLY designed driveway & entrance making this home PERFECT ! Welcome to the exquisite newly built home stately positioned on an 1.76 acre lot offering seasonal water views of Greenwood Pond . Interior boasts luxury construction with grand foyer entrance, 9’ ceilings on 1st floor , hardwood floors and everyone’s dream kitchen featuring shaker style white cabinetry with soft close features, crown molding , granite counters, tile backsplash, center island with ample seating space plus an informal dining area. Open to front to back LR with fireplace and slider to composite deck , formal dining room is accented with woodworking details including wainscoting and chair rail . Open staircase bring you to the 2nd floor where you will find the laundry rm, 4 bdrms inc primary suite with a true wall of closet space, cathedral ceilings, private bath with tile shower, soaking tub and double vanity. All bathrms have tile floors & marble countertops.— Janice Mitchell R.E., Inc

Key details

  • 2,501 sq ft
  • 1.78 acres
  • 4 beds
  • 2.5 baths
  • 2025 built
  • $315 / sq ft
MLS #
7⁠3⁠5⁠1⁠0⁠8⁠1⁠4⁠
Last updated
Address
61 SHADY
Town
Westminster, MA
ZIP
01473
Deed (Bk/Pg)
10896 / 41

Map

Neighborhood: Westminster

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.