Skip to main content

Listing broker remarks

Discover a timeless piece of livable art. It is a masterclass in organic design by architect Robert Kennedy and builder Eric Winslow. Set on 2.48 wooded acres bordering the estuaries of Herring River (Cape Cod National Seashore), this estate offers ultimate privacy. Kennedy's signature integration of architecture and custom furnishings begins at the boardwalk entrance and continues throughout the home. The interior features connected separation, using a central chimney, open balconies, and elevation changes to define spaces while maintaining an airy flow. Multiple curving perches offer intimate views of the wild Wellfleet landscape. While social areas are open, the bedrooms are distinctly private. The property also includes a 400 sq. ft. studio loft with a kitchenette above the two-car garage, plus a separate structure housing an artist's studio (also with kitchenette) and a once-functional indoor pool. This home is the pinnacle of Outer Cape privacy and architectural intent.— William Raveis Real Estate & Homes Services

Key details

  • 4,209 sq ft
  • 2.48 acres
  • 5 beds
  • 4.5 baths
  • 1987 built
  • $570 / sq ft
  • $15,893 2026 taxes
  • HOA b
MLS #
7⁠3⁠4⁠9⁠5⁠8⁠0⁠9⁠
Last updated
Address
65 & 75 Deer Path Way
Town
Wellfleet, MA
ZIP
02667

Map

Neighborhood: Wellfleet

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.