Skip to main content

Listing broker remarks

Stunning new construction offering exceptional design and modern living. Entertaining is elevated with this open-concept layout featuring a chef’s kitchen, living room, dining area, and fireplaced family room—seamlessly leading to a private deck with a built-in stone gas grill. No detail is overlooked; the walls boast custom woodwork and high-end finishes throughout. This thoughtfully crafted home features five bedrooms, each with its own en suite bath, including a luxurious second-floor primary suite with a custom walk-in closet. The first-floor bedroom with en suite provides ideal flexibility for guests or a home office. The oversized basement includes a full bath, along with a separate exercise room. Conveniently located near shopping, dining, and all amenities in Needham and Wellesley, with easy access to major commuter routes.— William Raveis R.E. & Home Services

Key details

  • 6,511 sq ft
  • 27,952 lot sq ft
  • 5 beds
  • 6.5 baths
  • 2026 built
  • $583 / sq ft
  • $28,689 2026 taxes
MLS #
7⁠3⁠5⁠1⁠4⁠2⁠7⁠9⁠
Last updated
Address
11 Skyline Drive
Town
Wellesley, MA
ZIP
02482
Deed (Bk/Pg)
36021 / 137

Map

Neighborhood: Wellesley

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.