Skip to main content

Listing broker remarks

Why wait to build when your brand-new home is ready now? Enjoy the ease of first-floor living in this thoughtfully designed ranch featuring an open-concept layout, a fully applianced kitchen with granite countertops, a spacious living room, and dining area perfect for everyday living and entertaining. The primary suite offers a walk-in closet and private bath with double vanity, while two additional bedrooms provide flexibility for guests, family, or a home office. Central air, first-floor laundry, and an attached two-car garage add comfort and convenience. Step outside to a 12x16 composite deck overlooking the backyard, or explore the possibilities offered by the walkout basement with high ceilings—ideal for future living space, a home gym, office, recreation room, or potential ADU. Move right in and enjoy all the benefits of low-maintenance, energy-efficient new construction.— Post Road Realty

Key details

  • 1,803 sq ft
  • 1.07 acres
  • 3 beds
  • 2 baths
  • 2025 built
  • $293 / sq ft
MLS #
7⁠3⁠4⁠6⁠3⁠6⁠0⁠5⁠
Last updated
Address
95 Town Farm Rd
Town
Warren, MA
ZIP
01083
Deed (Bk/Pg)
50139 / 169

Map

Neighborhood: Warren

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.