Skip to main content

Listing broker remarks

Brand new construction built with energy efficiency in mind, this stunning home, built in 2026, offers 1,280 sq. ft. of thoughtfully designed living space. This two-story residence features 3 spacious bedrooms and 2 full baths, combining modern style with everyday comfort. The open and inviting layout is ideal for today’s lifestyle, offering both functionality and convenience. The fully applianced kitchen features granite countertops and ample cabinet space, perfect for cooking and entertaining. Situated on a generous lot, this property provides plenty of outdoor space to enjoy. A wonderful opportunity to own a beautifully crafted new home with low-maintenance living. Schedule your showing today and experience all this exceptional property has to offer!— Post Road Realty

Key details

  • 1,280 sq ft
  • 13,068 lot sq ft
  • 3 beds
  • 2 baths
  • 2026 built
  • $288 / sq ft
MLS #
7⁠3⁠5⁠2⁠2⁠0⁠5⁠2⁠
Last updated
Address
71 Pine St
Unit
A
Town
Warren, MA
ZIP
01083
Deed (Bk/Pg)
54842 / 199

Historic designations

MACRIS Inventory
Warren Town Center

What this means for buyers →

Map

Neighborhood: Warren

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.