Skip to main content

Listing broker remarks

Updated plan! New Custom Ranch with walk out basement to be built on a tree-lined street in a newer subdivision on the Holland / Wales town line with an acre lot. Home features a Living room, Kitchen w/all wood cabinets & granite countertops, Dining area, Main Bedroom & 2 other bedrooms. Luxury vinyl plank flooring throughout. Granite countertops in bathroom. 200 amp electrical. Vinyl siding. Heating system is a dual fuel system. Hot water is from a high efficiency electric heat pump hot water heater. Appx 2 miles to Lake George. Public beach & boat ramp. Pictures are of similar homes builder has built and Lake George. Option to choose your own finishes. Lower level has a walk-out-basement. Potential to customize &/or add a rec room, bath or FP on lower level. Part of the Tantasqua / Union 61 School District. Come make this home your own!— RE/MAX Prof Associates

Key details

  • 1,000 sq ft
  • 1.03 acres
  • 3 beds
  • 1 baths
  • 2026 built
  • $459 / sq ft
MLS #
7⁠3⁠4⁠8⁠4⁠0⁠1⁠0⁠
Last updated
Address
Lot 5 /510 Old County Rd.
Town
Wales, MA
ZIP
01081

Map

Neighborhood: Wales

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.