Skip to main content

Listing broker remarks

Welcome to 95 Greenwood Avenue, a beautifully remodeled 4-bed, 3.5-bath Colonial offering approx. 2,400 sq. ft. of turnkey living in a commuter-friendly Wakefield location. The bright main level features hardwood floors, recessed lighting, an updated kitchen with white cabinetry, subway tile backsplash, new stainless appliances, a large center island, and seamless flow to the dining and living areas. Enjoy rare flexibility with both a first-floor primary suite and a second-floor primary suite, plus first-floor laundry—ideal for guests, multigenerational living, or aging-in-place potential. The finished basement adds space for a media room, office, gym, or playroom. Updates include new siding, new roof, central air/heat, updated electric, overhead lighting, and new appliances. Set on a .19-acre lot with a backyard fire pit, this home abuts Mapleway Playground and is close to Wakefield Center, Boston, and the MBTA commuter rail.— CDG Realty Group

Open Houses

Key details

  • 2,400 sq ft
  • 8,442 lot sq ft
  • 4 beds
  • 3.5 baths
  • 1955 built
  • $479 / sq ft
  • $6,939 2025 taxes
MLS #
7⁠3⁠5⁠3⁠6⁠9⁠8⁠5⁠
Last updated
Address
95 GREENWOOD AVENUE
Town
Wakefield, MA
ZIP
01880
Deed (Bk/Pg)
79705 / 160

Map

Neighborhood: Wakefield

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.