Skip to main content

Listing broker remarks

Come see your future dream home at the end of a quite cul-de-sac on 1.3 level acres. This is the last home in a new development. Quality New Construction home can be ready to close in less than 30 days. House is complete except for carpet on 2nd floor. Optional hardwood for extra cost. Certified Green Professional with over 30 years experience. 9 foot ceilings on first floor. 4 bedrooms, 2 1/2 baths. Family Room with Gas Fireplace with Marble Surround. Hardwood throughout 1st floor. Formal dining room, Office/Living room with French doors. Spacious Kitchen w/Granite Tops, Island, and Dining Area with a slider to a 12X16 maintenance free composite decking. Doghouse Walkout Basement. Master Bedroom Suite with double vanity, Tile Shower, Granite, with 3 closets, 2 of which are walk in closets. Minutes to Rt 146, approx. 20 mins to RT 495.— New England Home Pro

Key details

  • 2,750 sq ft
  • 1.30 acres
  • 4 beds
  • 2.5 baths
  • 2025 built
  • $301 / sq ft
MLS #
7⁠3⁠4⁠7⁠7⁠6⁠1⁠4⁠
Last updated
Address
138 Elm St
Town
Uxbridge, MA
ZIP
01569
Deed (Bk/Pg)
43036 / 315

Map

Neighborhood: Sherman Farm Estates

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.