Skip to main content

Listing broker remarks

Set on a full acre, this well-maintained Tewksbury ranch has been cared for by the same owner for more than 50 years. Offering more space than meets the eye, the home features a generous 20x20 addition that expands the living area and functionality. Major updates include a gas heating system installed in September 2025, a 14kW whole-house generator (2018), and a French drain system. An in-ground sprinkler system helps maintain the expansive yard, while the expanded basement area, partially finished, provides flexible space for hobbies, storage, a workshop, or future use. Additional highlights include an updated main bath, newer front and rear decks, and a backyard storage shed. This property presents a wonderful opportunity to enjoy a spacious lot, thoughtful updates, and decades of attentive ownership.— Chinatti Realty Group, Inc.

Key details

  • 1,861 sq ft
  • 1.00 acres
  • 3 beds
  • 2 baths
  • 1969 built
  • $343 / sq ft
  • $7,636 2025 taxes
MLS #
7⁠3⁠5⁠3⁠3⁠9⁠4⁠6⁠
Last updated
Address
15 Shawsheen St
Town
Tewksbury, MA
ZIP
01876
Deed (Bk/Pg)
20448 / 167

Map

Neighborhood: Tewksbury

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.