Skip to main content

Listing broker remarks

Thoughtfully updated throughout, this move-in-ready property offers the perfect blend of modern amenities, flexible living space, and stunning water views overlooking picturesque Lake Sabbatia. The centerpiece of the home is the expansive primary suite, featuring a spacious walk-in closet, walk out deck overlooking the lake, dedicated office area, and a luxurious en-suite bath complete with a double vanity. The updated kitchen is designed for both everyday living and entertaining, showcasing stainless steel appliances, quartz counters, and breakfast bar. The main level features gleaming hardwood floors, two additional bedrooms, a full bathroom, and convenient first-floor laundry. Above the attached one-car garage, a versatile bonus/media room provides the perfect space for a home theater, playroom, gym, or additional living area. Additional improvements include a new roof, siding and patio. This year-round waterfront home is waiting for you to make it your peaceful retreat.— Coldwell Banker Realty - Easton

Open Houses

Key details

  • 1,870 sq ft
  • 7,840 lot sq ft
  • 3 beds
  • 2 baths
  • 1930 built
  • $347 / sq ft
  • $4,069 2026 taxes
MLS #
7⁠3⁠5⁠3⁠6⁠5⁠1⁠1⁠
Last updated
Address
86 Lakeview Ave
Town
Taunton, MA
ZIP
02780
Deed (Bk/Pg)
27919 / 264

Map

Neighborhood: Taunton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.