Skip to main content

Listing broker remarks

Welcome to this stunning custom-built home offering 4–5 bedrooms and 3.5 baths, thoughtfully designed with high-end finishes and an open, flowing layout perfect for today’s lifestyle. Architectural details shine with vaulted, cathedral, and tray ceilings, custom woodwork, and skylights that fill the home with natural light. The chef’s kitchen features a large center island, granite countertops, stainless steel appliances, and pantry, seamlessly opening to spacious living and dining areas ideal for entertaining. A loft/balcony adds flexible space, while first-floor laundry and generously sized bedrooms enhance everyday comfort. Enjoy a newer metal roof, 2-car garage, irrigation, patio, and a large basement with future potential. Set in a quiet subdivision with underground utilities, city water and sewer, and convenient access to Routes 24, 495, 44 & 140.— Century 21 Realty Network

Key details

  • 4,033 sq ft
  • 30,492 lot sq ft
  • 5 beds
  • 3.5 baths
  • 1994 built
  • $216 / sq ft
  • $8,751 2025 taxes
MLS #
7⁠3⁠4⁠8⁠9⁠3⁠0⁠5⁠
Last updated
Address
71 Tania Drive
Town
Taunton, MA
ZIP
02718
Deed (Bk/Pg)
28553 / 323

Map

Neighborhood: Taunton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.