Skip to main content

Listing broker remarks

Charming and beautifully updated home offering the perfect opportunity for first-time buyers or those looking to downsize without sacrificing space! This move-in ready home features an open floor plan with direct access to a cozy deck overlooking a private backyard—ideal for entertaining or relaxing. The newly renovated finished basement suite adds exceptional bonus living space making it perfect for entertaining, a family room, guest area, home office, or flexible living setup. Mini-split system provides efficient comfort with air conditioning all summer long. Additional features include a separate workshop and exercise area with walk out exterior access and ample laundry/storage space. Conveniently located close to shopping, restaurants, and major highways for an easy commute! Schedule a private showing today or visit us at the Open House on Sunday May 17th from 10:30 - 12:00— P & H Property Consulting, Inc.

Key details

  • 1,404 sq ft
  • 42,689 lot sq ft
  • 2 beds
  • 1 baths
  • 1985 built
  • $284 / sq ft
  • $5,526 2025 taxes
MLS #
7⁠3⁠5⁠1⁠8⁠5⁠6⁠9⁠
Last updated
Address
75 Fairview Park Rd
Town
Sturbridge, MA
ZIP
01566
Deed (Bk/Pg)
67878 / 328

Historic designations

MACRIS Inventory
Fiske Hill

What this means for buyers →

Map

Neighborhood: Sturbridge

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.