Skip to main content

Listing broker remarks

Experience the perfect blend of style and functionality in this spacious contemporary Cape, ideal for those seeking single-level living with room to grow. The sunlit open kitchen features granite countertops, a 9’ center island, and breakfast bar, flowing into a Great Room with a cozy fireplace and an expansive dining area. The first-floor primary suite includes a luxurious en suite bath with huge tiled shower and a whirlpool tub, plus two additional bedrooms and a full bath. Upstairs offers two bonus rooms, a full bath and a massive finished bonus area: ideal for playroom or home office. . Enjoy outdoor entertaining on the composite deck, and take advantage of the two-car garage. Energy-efficient bosch heat pumps for heating and cooling add year-round comfort with incredible efficiency. Located in a prime area with quick access to major routes—email today for the full info package!— RE/MAX Partners

Key details

  • 3,540 sq ft
  • 1.00 acres
  • 4 beds
  • 3 baths
  • 2026 built
  • $273 / sq ft
MLS #
7⁠3⁠4⁠6⁠9⁠7⁠1⁠6⁠
Last updated
Address
558 Haynes St.
Town
Sturbridge, MA
ZIP
01566

Map

Neighborhood: Sturbridge

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.