Skip to main content

Listing broker remarks

NEW CONSTRUCTION | FALL 2026 MOVE-IN. Brand new Evoke model coming to Blueberry Hill Estates! Scheduled for July delivery with fall move-in. Our most popular floorplan, this thoughtfully designed home features an open-concept layout, bright living space, and a modern kitchen with stainless steel appliances, farmhouse sink, and full tile backsplash. Central A/C, energy-efficient construction, and quality finishes throughout. Private patio for outdoor living. Low-maintenance lifestyle in a professionally managed 55+ community surrounded by natural scenery. Blueberry Hill Estates is a land-leased community. The monthly fee includes sewer & water, real estate taxes, trash & recycling, snow plowing & maintenance of the roadways/sidewalks, landscaping, cable TV, and high-speed internet—offering true low-maintenance living. 1 year full warranty & 7-year limited warranty included. A community center with outdoor space will be built as part of Phase 3.— J.W. Management & Sales, Inc.

Key details

  • 2026 built
MLS #
7⁠3⁠5⁠0⁠7⁠0⁠7⁠3⁠
Last updated
Address
21 Pinrock Drive
Town
Sturbridge, MA
ZIP
01566

Map

Neighborhood: Blueberry Hill Estates

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.