Skip to main content

Listing broker remarks

Perfect for summer, beautiful level grounds on a country road near Butternut Golf Course. So many updates and custom features including beautiful windows, radiant heat in great room & a young Roof. Relax and enjoy the great room, the sunroom, or grill on the large patio. 9 rooms, 2.5 baths, 2nd-floor study or playroom. Wonderful flexible spaces. Room to grow inside and out. Plus, a large 2c garage with workspace. The lower level offers space to work out or create a workshop. Get ready to have a party Perfect for year-round enjoyment. Stow schools, Hundreds of acres of conservation land and trail, Swim, kayak, boat, fish, minutes to the park and beach, The Assabet Rail Trail & Shopping in Sudbury, Maynard & Hudson. The lowest Electric Rates in the State. This was Designed with love. Come enjoy!— Fisher And Associates

Key details

  • 3,162 sq ft
  • 1.00 acres
  • 4 beds
  • 2.5 baths
  • 1968 built
  • $284 / sq ft
  • $13,408 2025 taxes
MLS #
7⁠3⁠5⁠1⁠6⁠3⁠6⁠6⁠
Last updated
Address
60 Wheeler Rd
Town
Stow, MA
ZIP
01775
Deed (Bk/Pg)
81290 / 366

Map

Neighborhood: Stow

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.