Skip to main content

Listing broker remarks

Discover this cozy single-family residence located on a cul-de-sac, presented in a ready to move in condition. Enjoy spacious 4bdrms, 2 bathrooms, LR separate Din Rm. The kitchen, a central hub for culinary endeavors, features elegant stone countertops that provides durability for daily preparations. A stylish backsplash compliments this design, creating an appealing atmosphere for anyone who enjoys cooking. Within the living room, a captivating fireplace offers a warm focal point, perfect for a serene evening. An accent wood wall adds a distinctive touch, contributing unique character and depth to the overall ambiance of this gathering space. One of the two full bathrooms provides the convenience of a walk-in shower. Enjoy the beautiful deck and large backyard. 2 car garage for protection of your vehicle. Showings start at Open house, Sat 5/30 from Noon-1:00PM— Gallagher Real Estate

Key details

  • 1,808 sq ft
  • 13,503 lot sq ft
  • 4 beds
  • 2 baths
  • 1987 built
  • $243 / sq ft
  • $6,515 2025 taxes
MLS #
7⁠3⁠5⁠0⁠8⁠9⁠0⁠4⁠
Last updated
Address
21 Ryan Cir
Town
Springfield, MA
ZIP
01118
Deed (Bk/Pg)
16700 / 213

Map

Neighborhood: Springfield

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.