Skip to main content

Listing broker remarks

Welcome to 42 High St!! This 2026 new construction single family residence in north Shrewsbury presents a contemporary living experience in a truly exceptional setting. The residence offers a modern aesthetic with an emphasis on functionality and modern living throughout the home. This expansive dwelling with 4 bedrooms and 5 full baths is thoughtfully designed to accommodate both sophisticated entertaining and quiet moments of reprieve. Consider the possibilities within its walls, where natural light dances across open spaces, creating an ambiance of warmth and sophistication. This house truly offers a touch of elegance with each room providing a private retreat for relaxation and rejuvenation. Finished basement with full bathroom offers flexibility to living space. Additional living or game room area accompanied with a separate office space ideal for remote work area or studying. Convenient attached generous sized two-car garage.— Castinetti Realty Group

Key details

  • 3,900 sq ft
  • 21,232 lot sq ft
  • 4 beds
  • 5.5 baths
  • 2026 built
  • $347 / sq ft
  • $3,434 2025 taxes
MLS #
7⁠3⁠4⁠9⁠9⁠5⁠9⁠6⁠
Last updated
Address
42 High St
Town
Shrewsbury, MA
ZIP
01545
Deed (Bk/Pg)
69345 / 292

Map

Neighborhood: Shrewsbury

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.