Skip to main content

Listing broker remarks

Experience true oceanfront living at this exceptional Humarock Beach residence with direct beach access and unobstructed views of the Atlantic Ocean and South River. Completely renovated from the studs in 2022, this coastal retreat blends modern finishes with timeless seaside style. Multiple expansive decks capture spectacular sunrises over the ocean and serene sunsets over the South River, while an oceanfront patio offers the perfect place to relax or entertain just steps from the sand. The home features abundant, well-designed storage for beach gear, seasonal items, and everyday living. Additional highlights include ample guest parking, a whole-house generator, and a prime location near local restaurants and the marina, making this an ideal year-round residence or luxury coastal getaway.— Coldwell Banker Realty - Duxbury

Key details

  • sold
  • 1,368 sq ft
  • 10,750 lot sq ft
  • 3 beds
  • 2 baths
  • 1955 built
  • $730 / sq ft
  • $9,579 2026 taxes
MLS #
7⁠3⁠5⁠1⁠3⁠3⁠7⁠8⁠
Last updated
Address
234 Central Ave
Town
Scituate, MA
ZIP
02047
Sold for
$1,000,000
Deed (Bk/Pg)
664 / 9

Map

Neighborhood: Scituate

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.