Skip to main content

Listing broker remarks

New construction Nantucket-style Gambrel offering 4 bedrooms, 2.5 baths, and a flexible floor plan designed for today's lifestyle. Built by a respected local builder, this home features bright, open living spaces and quality craftsmanship throughout. The thoughtfully designed layout includes the option for an additional family room or a first-floor primary suite. Set on a beautiful level lot, the outdoor space is ideal for entertaining, summer barbecues, recreation, or gardening. A two-car garage provides added convenience and storage. Enjoy a desirable coastal location with close proximity to area beaches, local amenities, and ocean glimpses from select vantage points. An exciting opportunity to own a brand-new home and personalize select finishes while construction is underway. Buyer to perform their own due diligence regarding all specifications and features. Permit to cpmpletion approx 7 months.— Conway - Scituate

Key details

  • 2,360 sq ft
  • 12,502 lot sq ft
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $635 / sq ft
  • $5,126 2026 taxes
MLS #
7⁠3⁠5⁠2⁠7⁠1⁠4⁠9⁠
Last updated
Address
20 Garden Road
Town
Scituate, MA
ZIP
02066
Deed (Bk/Pg)
552 / 131

Map

Neighborhood: Scituate

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.