Skip to main content

Listing broker remarks

May 24th Open House CANCELLED.....Charming Rockport Cape in the heart of town. Just moments to iconic Bearskin Neck, The Shalin Liu Performance Center, Motif #1, beaches, restaurants, shops and the waterfront. Enjoy the lifestyle most just dream of. This sweet property boasts a classic floorplan; featuring hardwood flooring on the first level with an open floor plan leading from kitchen to dining room. Finishing out the first floor is a cozy family room along with a full bath and first floor bedroom (currently used as an office). A large main bedroom, 2 additional bedrooms and another full bath complete the second level. Walk out basement accesses the back yard with a deck for quiet entertaining and plenty of parking plus an additional street level parking space for convenience.— Churchill Properties

Key details

  • 1,356 sq ft
  • 4,312 lot sq ft
  • 4 beds
  • 2 baths
  • 1945 built
  • $515 / sq ft
  • $5,874 2025 taxes
MLS #
7⁠3⁠5⁠1⁠3⁠8⁠0⁠9⁠
Last updated
Address
64 High St
Town
Rockport, MA
ZIP
01966
Deed (Bk/Pg)
33047 / 452

Map

Neighborhood: Rockport

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.