Skip to main content

Listing broker remarks

New construction in the sought after Reserve at Spring Hill community. The Chatham style home with vaulted ceilings welcomes you to open concept, single-level living. This thoughtfully designed home offers hardwood flooring throughout, your choice of quartz countertops, upgraded appliances, and modern fixtures throughout the home. While still under construction, you'll have the ability to make personalized selections to make this house feel like home. The two bedroom, two bathroom floor plan offers plenty of space to host family and friends - along with a dedicated study to be used as a private home office or den. The exterior is beautifully finished with a covered porch on the front facade, along with a covered porch in the back against the tree-lined property. Please note, this home is currently under construction - listing photos are renderings and/or virtual staging from a model home.— Spring Hill Real Estate Sales

Key details

  • 1,439 sq ft
  • 7,840 lot sq ft
  • 2 beds
  • 2 baths
  • 2025 built
  • $481 / sq ft
  • HOA a
MLS #
7⁠3⁠4⁠0⁠6⁠0⁠6⁠2⁠
Last updated
Address
51 Sophia Drive
Town
Rehoboth, MA
ZIP
02769

Map

Neighborhood: The Reserve at Spring Hill

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.