Skip to main content

Listing broker remarks

This 3 bedroom 2 bath multi level home with a totally fenced in yard and nothing to do but move in, should not be missed. This property has been totally remodeled in the past few years, walls came down, house was made larger by incorporating the 3 season room into the house by removing the slider and fully insulating the space, new septic (before purchase), new kitchen, new bath, new roof, all new recessed lighting, new hardwood flooring, a whole new electrical service with new generator switch, a whole house water filtration system with a reverse osmosis drinking water system as well, a french drain system and epoxy floor was added to the basement and so much more. The open floor plan created by the current owner is unmatched and amazing from the previous design. You will not be disappointed. SHOWINGS ARE BY APPOINTMENT ONLY BEGINNING SATURDAY 5/16— Curtis Nunes Real Estate

Key details

  • 2,051 sq ft
  • 1.40 acres
  • 3 beds
  • 2 baths
  • 1975 built
  • $338 / sq ft
  • $4,567 2026 taxes
MLS #
7⁠3⁠5⁠1⁠7⁠5⁠8⁠9⁠
Last updated
Address
197 Chestnut St
Town
Rehoboth, MA
ZIP
02769
Deed (Bk/Pg)
LC89 / 56

Map

Neighborhood: Rehoboth

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.