Skip to main content

Listing broker remarks

NEW CONSTRUCTION-With First Floor Bedroom. Beautiful new home conveniently located near Reading center and all major highways. This 5 bedroom, 3.5 bath, 4,200 square foot home will feature a kitchen with floor to ceiling cabinetry, quartz countertops and high end appliances. A family room with vaulted ceilings and a gas fireplace. There's also a first floor work at home office space with separate full bathroom that could be used a guest bedroom. Plenty of storage on the first floor as well with a pantry off of the kitchen and custom built mudroom that connects to a two car garage. On the second floor, you will find four bedrooms. The primary suite has ample closet space, a bath with double vanity, shower, and soaking tub. Laundry is located on the second floor as well. Custom millwork and luxe lighting throughout. Walkout basement to large private lot surrounded by nature.— John T Burns

Key details

  • 4,300 sq ft
  • 1.04 acres
  • 5 beds
  • 3.5 baths
  • 2025 built
  • $509 / sq ft
  • $10,121 2024 taxes
MLS #
7⁠3⁠3⁠4⁠1⁠1⁠6⁠2⁠
Last updated
Address
41 Winter St
Town
Reading, MA
ZIP
01867
Deed (Bk/Pg)
81872 / 453

Map

Neighborhood: Reading

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.