Skip to main content

Listing broker remarks

Don’t miss this exceptional custom Colonial in the sought-after Ship Pond Estates! Built in 2023 and located on a 1.4-acre lot, this 4-bedroom, 3.5-bath home blends modern finishes with thoughtful design. The first floor features an oversized kitchen with a large island and stainless-steel appliances, a home office, a convenient half bath, and a grand living room with a gas fireplace. Upstairs are three generous bedrooms, a full bath, and a luxurious primary suite with double vanity, a large custom-tiled shower, and a soaking tub. The fully finished walk-out basement offers an open-concept family room and a full bathroom—ideal for entertaining or relaxing. Outside, a private deck overlooks the yard, perfect for morning coffee or evening grilling. Make this stunning property your next home.— NextHome Signature Realty

Key details

  • 3,992 sq ft
  • 1.40 acres
  • 4 beds
  • 3.5 baths
  • 2023 built
  • $300 / sq ft
  • $10,979 2025 taxes
MLS #
7⁠3⁠5⁠1⁠9⁠1⁠8⁠1⁠
Last updated
Address
95 Nautical Way
Town
Plymouth, MA
ZIP
02360
Deed (Bk/Pg)
58007 / 87

Map

Neighborhood: Plymouth

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.