Skip to main content

Listing broker remarks

NEW CONSTRUCTION – Ready for delivery in late July or August .. Brand New Floor Plans at Symington Woods! The thoughtfully designed "Seawind" floor plan features a main floor primary suite for easy, comfortable living. The open-concept kitchen, dining, and living areas create a bright and inviting space, perfect for both everyday living and entertaining. A slider off the living room leads to a private deck, extending your living space outdoors. The second level offers an additional bedroom and bath, ideal for guests, plus a loft that would make a great bonus space or office. The large unfinished walkout basement provides tons of storage or endless potential for more living space. A perfect blend of convenience, flexibility, and modern design. Don’t miss the opportunity to own this exceptional new construction home with a one year builder warranty. Proudly built by Whitman Homes.— East Bay View Realty LLC

Key details

  • 1,750 sq ft
  • 2,508 lot sq ft
  • 2 beds
  • 2.5 baths
  • 2026 built
  • $451 / sq ft
  • HOA a
MLS #
7⁠3⁠5⁠0⁠0⁠4⁠8⁠2⁠
Last updated
Address
8 Snapdragon
Town
Plymouth, MA
ZIP
02360

Map

Neighborhood: Pinehills

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.