Skip to main content

Listing broker remarks

Rise above it all to your own private sanctuary! Tucked away for maximum privacy, the elevated driveway leads you to a perfectly flat, serene lot that feels like a world of its own. This lovely home features a bright, open floor plan with 10' ceilings, a gas fireplace, and a custom kitchen with cherry cabinets, granite counters, and brand-new, high-grade LG kitchen appliances. Major high-efficiency upgrades include Pella Impervia windows with Levolor blinds, a Rinnai on-demand water heater, a high-efficiency furnace, and new insulation. Step outside to your new poured concrete patio and enjoy a beautifully landscaped backyard with direct access to walking paths and Moreys Pond for fishing and boating. Located in a friendly "block party" neighborhood with easy paved road access to Route 3A, this home is the ultimate retreat. Complete with a new roof and gutter covers, all you have to do is move in. Welcome to the top! Offers due Tuesday 5pm.— Redfin Corp.

Key details

  • 1,691 sq ft
  • 42,650 lot sq ft
  • 3 beds
  • 2 baths
  • 2000 built
  • $383 / sq ft
  • $7,906 2025 taxes
  • HOA b
MLS #
7⁠3⁠5⁠1⁠8⁠8⁠6⁠2⁠
Last updated
Address
64 Early Red Cir
Town
Plymouth, MA
ZIP
02360
Deed (Bk/Pg)
32945 / 96

Map

Neighborhood: Harrison Woods - Camp Childs

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.