Skip to main content

Listing broker remarks

NEW CONSTRUCTION – Ready for delivery in May-June. Brand New Floor Plans at Symington Woods! Beautifully designed "Tidewater" floor plan featuring an open-concept 1st floor layout perfect for modern living. The upgraded kitchen offers quartz countertops and a seamless flow into the dining and living areas, ideal for entertaining. Step out from the living room onto a private deck with peaceful treetop views. A thoughtfully designed mudroom includes a built-in bench for everyday convenience. With 3 spacious bedrooms and 2.5 baths, this home combines style, comfort, and functionality. Tons of storage in the unfinished walk-out basement or huge potential for more living space! Don’t miss the opportunity to own this exceptional new construction home with a one year builder warranty. Proudly built by Whitman Homes.— East Bay View Realty LLC

Key details

  • 1,840 sq ft
  • 2,508 lot sq ft
  • 3 beds
  • 2.5 baths
  • 2026 built
  • $416 / sq ft
  • HOA a
MLS #
7⁠3⁠4⁠9⁠6⁠3⁠0⁠8⁠
Last updated
Address
3 Fiddlehead
Town
Plymouth, MA
ZIP
02360

Map

Neighborhood: Pinehills

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.