Skip to main content

Listing broker remarks

One of the final homes Owls Nest! walk to the private clubhouse and pool. Move into this brand new one level home spring 2027. This popular open layout will wow, from the elegant foyer to the large kitchen with center island and breakfast area, flowing into the fireplaced great room with gas fireplace, 10' ceilings and glass door to the rear deck. The luxurious primary bedroom suite includes a light filled bathroom with a large tiled walk in shower and marble seat, dual sink vanity, linen and walk in closets. This home design also features private space for guests with a secondary bedroom, and bathroom, a dedicated office, and laundry on the main level. Additional features include a bright finished walkout basement with a full bathroom, two car garage, and more. Work with our team of professionals to select from today's popular finishes, home technology and outdoor living.— Toll Brothers Real Estate

Key details

  • 1,913 sq ft
  • 6,068 lot sq ft
  • 2 beds
  • 3 baths
  • 2026 built
  • $516 / sq ft
  • HOA a
MLS #
7⁠3⁠4⁠8⁠8⁠1⁠7⁠2⁠
Last updated
Address
12 Owls Nest
Unit
5
Town
Plymouth, MA
ZIP
02360

Map

Neighborhood: Toll Brothers Owls Nest

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.