Skip to main content

Listing broker remarks

New Construction!! Three bedroom contemporary chalet to be built on a 17 acre portion of the 1800's E.B. Palmer farm. Two owners in a construction company partnership bought the property 20 years ago with the idea that each would build a personal home on the acreage. Life changed. Now semi retired, they are contracting with a builder of quality manufactured homes to build modern, efficient homes on the property. Marcy Road is a lightly populated, town maintained road 1.5 miles from Route 8. Easily accessed from NY, CT & the Mass Pike and convenient to many Berkshire attractions. The massive 2.5 acre Otis Town Beach on 300+ acre Big Pond is less than 5 miles away. The lot is forested with frontage on both sides of Dimmock Brook. Perc tests are schedule for as soon as conditions permit. The final survey will be completed soon after. Electric, phone and fiber optic are in place on the street. Please see the supplement for a description of the house.— Red Horse Real Estate

Key details

  • 1,798 sq ft
  • 17.00 acres
  • 3 beds
  • 2.5 baths
  • 2026 built
  • $461 / sq ft
  • $1 3026 taxes
MLS #
7⁠3⁠5⁠0⁠3⁠4⁠6⁠5⁠
Last updated
Address
Lot 1 Marcy Road
Town
Otis, MA
ZIP
01253

Map

Neighborhood: Otis

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.