Skip to main content

Listing broker remarks

Private sanctuary nestled in the woods on 2.34 acres with stream and just minutes to the lake. This open floor plan contemporary offers 3 bedrooms and 2 1/2 baths. One bedroom with full bath is located on the first floor and two upstairs with a second full bath. Soaring & dramatic cathedral ceilings open to a cozy loft room above which is perfect for a den or home office. Giant sun room off the back has skylights and lots of glass to let the outside in. Sliders to a large deck for entertaining, finished room in the basement makes great game room with work shop. Storage shed, pellet stove in living room, wood stove in basement. Three newer heat pump mini-splits for heating and cooling (AC). Get away from the madness of the world and enjoy nature at your secluded, wooded lot. Just a short drive or walk to a sandy beach for swimming at the lake.— RE/MAX Compass

Key details

  • 1,720 sq ft
  • 2.34 acres
  • 3 beds
  • 2.5 baths
  • 1987 built
  • $226 / sq ft
  • $2,897 2025 taxes
MLS #
7⁠3⁠5⁠2⁠9⁠6⁠1⁠0⁠
Last updated
Address
752 Algerie Road
Town
Otis, MA
ZIP
01253
Deed (Bk/Pg)
6437 / 209

Map

Neighborhood: Otis

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.