Skip to main content

Listing broker remarks

Welcome Home to Wheelock Farm! This stunning new construction Continental floor plan, offering an exceptional blend of luxury and functionality. The home includes a 2-car side-load garage, a spacious gathering room, and a light-filled café area. The gourmet kitchen is perfect for entertaining, with a gas cooktop, microwave/over wall unit, and an oversized pantry for added storage. A flex space, 5th bedroom, and full bath complete the first floor. Upstairs the Owner’s Suite is a true retreat with a luxurious en-suite bath, two oversized, spacious closets, and a private sitting area. You’ll find three additional bedrooms, a large bathroom, a versatile loft space, and a convenient laundry room. Set in a picturesque, tree-lined community in Norton, this home is just minutes from local restaurants, shopping, the commuter rail, and major highways, offering the perfect blend of modern living and convenience.— Pulte Homes of New England

Key details

  • 3,013 sq ft
  • 1.10 acres
  • 5 beds
  • 3 baths
  • 2026 built
  • $462 / sq ft
  • HOA q
MLS #
7⁠3⁠5⁠1⁠4⁠6⁠2⁠8⁠
Last updated
Address
29 Germain Way
Unit
3
Town
Norton, MA
ZIP
02766

Map

Neighborhood: Wheelock Farm

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.