Skip to main content

Listing broker remarks

Tucked away on 8.5+ private acres, this custom-built 4,114 sq. ft. retreat offers a wonderful blend of luxury, sustainability, and tranquility. Designed for comfortable living and entertaining, the open floor plan flows effortlessly between indoor and outdoor spaces. Expansive scenic views serve as a stunning backdrop to the home and are enjoyed from many rooms, including the well-appointed kitchen, with direct access to the spectacular screened porch, a true highlight. Rich cherry floors grace the main level, while 5 bedrooms and 4.5 baths provide generous space for family and guests. The finished walk-out basement adds 1,427 sq. ft. of living space with abundant storage. Carbon-free heating and cooling come from two large heat pumps, with costs offset by owned solar panels. The 3-car, EV-ready garage features an epoxy floor, while a whole-house generator provides added peace of mind. Showings begin Saturday, May 30.— Delap Real Estate LLC

Key details

  • 4,114 sq ft
  • 8.51 acres
  • 5 beds
  • 4.5 baths
  • 2001 built
  • $352 / sq ft
  • $18,417 2025 taxes
MLS #
7⁠3⁠5⁠2⁠5⁠3⁠7⁠5⁠
Last updated
Address
422 Park Hill Rd
Town
Northampton, MA
ZIP
01062

Map

Neighborhood: Northampton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.