Skip to main content

Listing broker remarks

Tucked along the scenic Mill River in the heart of Leeds, this unique property at 42 Water Street offers a rare blend of nature, charm, and comfort. Surrounded by mature trees and peaceful water views, the home features warm wood floors, vaulted ceilings with skylights, and an inviting open-concept layout filled with natural light. The spacious kitchen flows seamlessly into the living area, creating the perfect space for entertaining or relaxing. Outside, enjoy multiple riverside seating areas, a private patio, and tranquil outdoor spaces that feel like your own hidden retreat. Conveniently located just minutes from downtown Northampton, local shops, restaurants, bike paths, and conservation areas, this special home offers the perfect balance of privacy and accessibility. A truly one-of-a-kind Leeds setting with character and charm throughout.— Coldwell Banker Community REALTORS®

Key details

  • 2,158 sq ft
  • 10,202 lot sq ft
  • 4 beds
  • 2 baths
  • 1900 built
  • $300 / sq ft
  • $7,037 2025 taxes
MLS #
7⁠3⁠5⁠2⁠5⁠0⁠4⁠8⁠
Last updated
Address
42 Water St
Town
Northampton, MA
ZIP
01053

Map

Neighborhood: Northampton

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.