Skip to main content

Listing broker remarks

Nearing completion for its new family! One of the last "NEW" available completing Westward Estates! Tan farmhouse with black windows and gutters! Vinyl clapboard siding with cedar impression accents. Driveway with side entry garage off of Homeward. EV charger Metal roof over the porch! Functional floor plan. Large deck off the back! Basement is walkout with "dog house" Kitchen has gas six burner Viking stove, beverage/ coffee bar with floating shelves and beverage fridge, Large wood island with white cabinetry Home office with french doors and transoms Crown moldings, Several rooms are appointed with wainscoting. Large open sunny foyer Primary bedroom has beautiful walk in closet and a tiled shower with separate soaking tub with skylight above. 2nd floor laundry, Natural gas heat and fireplace with wood mantle. Hardwoods and C/T. Mud rm. All photos represent quality of craftsmanship, may not represent actual interior of home Foam insulation— C. Walsh Realty, Inc.

Key details

  • 3,233 sq ft
  • 20,185 lot sq ft
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $402 / sq ft
MLS #
7⁠3⁠5⁠3⁠5⁠3⁠0⁠2⁠
Last updated
Address
427 Landry Ave
Town
North Attleboro, MA
ZIP
02760

Map

Neighborhood: North Attleboro

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.