Skip to main content

Listing broker remarks

Feel the luxury of Newton single family living in this new construction townhome. Set on a quiet street in Newton Upper Falls, this home is just what you have been searching for. Featuring an open concept kitchen, dining, and living area with ample natural lighting and an electric fireplace to set the tone. Offering 5 beds and 4.5 baths, this home includes a fully fenced front yard with green space. The primary suite has a private bath with double vanity and walk-through closet, while additional bedrooms provide flexibility for guests, work, or growing needs. Finished lower level adds valuable living space. One-car garage, central air, efficient systems and attention to detail at every turn. Located near the Charles River, Hemlock Gorge, shops, dining, and major routes. This is an opportunity you won't want to miss.— Douglas Elliman Real Estate - Park Plaza

Key details

  • 3,495 sq ft
  • 8,250 lot sq ft
  • 5 beds
  • 4.5 baths
  • 2026 built
  • $500 / sq ft
MLS #
7⁠3⁠5⁠2⁠5⁠1⁠1⁠0⁠
Last updated
Address
28 Keefe Ave
Town
Newton, MA
ZIP
02464
Deed (Bk/Pg)
84163 / 102

Map

Neighborhood: Newton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.