Skip to main content

Listing broker remarks

Striking new construction thoughtfully designed for modern living, the open floor plan is complimented by high ceilings and the finest finishes.The 1st floor has an open living and dining space with designer kitchen fitted with custom cabinetry, Miele appliances and chevron hardwood floors. The living area opens to the back stone paved patio and fenced in yard. The 2nd floor has 3 spacious bedrooms with a primary suite with walk-in closet. The 4th level is a spacious loft, ideal as an office or playroom, complete with a bathroom. The lower level has tall ceilings, a family room, custom wet bar and beverage center, bedroom and full bath. In addition will enjoy parking for 3 cars. Enjoy the proximity restaurants, public transportion, parks and minutes into Boston.— Bellafi Real Estate, Inc.

Key details

  • sold
  • 4,000 sq ft
  • 4,228 lot sq ft
  • 4 beds
  • 3 baths
  • 2026 built
  • $587 / sq ft
  • $999,999 2026 taxes
MLS #
7⁠3⁠5⁠0⁠7⁠0⁠5⁠7⁠
Last updated
Address
245 Webster St
Town
Newton, MA
ZIP
02465
Sold for
$2,260,000
Deed (Bk/Pg)
83387 / 158

Map

Neighborhood: Newton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.