Skip to main content

Listing broker remarks

Last unit left! This stylish new construction townhome is bright and airy featuring over 3,200 sq ft of space, a 2 car garage, and an exclusive backyard. The open concept 1st floor offers many stunning features like a chef's kitchen featuring Thermador appliances, gorgeous custom white oak slim shaker cabinets, 9 ft ceilings, and a linear fireplace with white oak panel details. There are 3 bedrooms on the 2nd level, including the primary suite with its large walk-in closet, and a gorgeous spa-like bathroom. The second floor also includes a bathrooms with a tub and a laundry closet. The fully finished 3rd floor gives you bonus space with a full bathroom. The lower level features a mudroom entry from the garage. Located just minutes from I-90, local restaurants, and shops.— William Raveis R.E. & Home Services

Key details

  • 3,199 sq ft
  • 12,900 lot sq ft
  • 4 beds
  • 3.5 baths
  • 2025 built
  • $529 / sq ft
  • $999 2026 taxes
MLS #
7⁠3⁠5⁠2⁠6⁠5⁠6⁠1⁠
Last updated
Address
15 Jewett Pl
Unit
B
Town
Newton, MA
ZIP
02458
Deed (Bk/Pg)
73995 / 506

Historic designations

MACRIS Inventory
Emerson, Darius R. House

What this means for buyers →

Map

Neighborhood: Newton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.