Skip to main content

Listing broker remarks

Custom built in 2013 by renowned local builder Cindy Stumpo, this exceptional 4 bed, 4.5 bath home blends quality craftsmanship with modern convenience. Thoughtfully designed with hardwood floors throughout main living areas and carpet in bedrooms, the home features a high-end kitchen with Sub-Zero refrigeration, JennAir induction cooktop (gas-ready), double ovens, and a microwave drawer. Living spaces are anchored by wood-burning and gas fireplaces, while the primary suite offers heated bathroom floors. Includes a home office and abundant storage throughout. A fully finished lower level offers a private 5th bedroom, ensuite bath and wired media room. Additional highlights include 4-zone HVAC, WiFi thermostats, EV charger, security system, irrigation, storage shed, landscape lighting, and a 2-car garage. Meticulously maintained by original owners with patio added in 2021.— Tullos Realty Partners LLC

Key details

  • 4,721 sq ft
  • 10,190 lot sq ft
  • 4 beds
  • 4.5 baths
  • 2013 built
  • $603 / sq ft
  • $25,340 2026 taxes
MLS #
7⁠3⁠5⁠0⁠9⁠5⁠6⁠6⁠
Last updated
Address
140 Greenwood St
Town
Newton, MA
ZIP
02459
Deed (Bk/Pg)
61589 / 358

Map

Neighborhood: Newton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.