Skip to main content

Listing broker remarks

Presenting an exceptional opportunity at 271 Reed, New Bedford, MA, this single-family residence, 2 blocks away from Buttonwood Park. This home has undergone a complete and comprehensive remodel, offering 1472 square feet of meticulously updated living space. This property represents a harmonious blend of historical character and contemporary sophistication. The open-plan kitchen, a focal point for modern living, is appointed with stainless steel appliances and stone counters, complemented by a central island that facilitates both culinary endeavors and social interaction, seamlessly flowing into the living room. The living room itself is distinguished by its elegant hardwood flooring, establishing a refined and inviting atmosphere. Among the four thoughtfully designed bedrooms.— Keller Williams South Watuppa

Key details

  • 1,472 sq ft
  • 4 beds
  • 1.5 baths
  • 1915 built
  • $332 / sq ft
MLS #
7⁠3⁠5⁠1⁠6⁠0⁠7⁠6⁠
Last updated
Address
271 Reed
Town
New Bedford, MA
ZIP
02740
Deed (Bk/Pg)
12379 / 213

Map

Neighborhood: New Bedford

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.