Skip to main content

Listing broker remarks

New Construction!! Stunning modern luxury with international flair in one of Needham’s most desirable neighborhoods. Pictures are Computer generated. This custom-built home on a lush 16,500 SF lot offers 6896 SF above grade plus a 3,718 SF finished lower level. Features include 5+ bedrooms, 8 full baths, and potential for a first- or lower-level ADU/in-law suite. A dramatic two-story great room with floor-to-ceiling windows anchors elegant living spaces. Chef’s kitchen with Wolf and Sub-Zero appliances, custom cabinetry, and oversized island opens to an extraordinary courtyard with mezzanine deck and traditional tea/meditation room. Second level offers four ensuite bedrooms, including a luxurious primary suite. Mudroom, central air, tankless hot water, and 2-car garage complete this exceptional offering.— Keller Williams Realty

Key details

  • 9,760 sq ft
  • 31,233 lot sq ft
  • 6 beds
  • 8 baths
  • 2026 built
  • $367 / sq ft
MLS #
7⁠3⁠5⁠2⁠4⁠0⁠1⁠7⁠
Last updated
Address
80 Gary Rd
Town
Needham, MA
ZIP
02494
Deed (Bk/Pg)
40727 / 296

Map

Neighborhood: Needham

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.