Skip to main content

Listing broker remarks

NEW CONSTRUCTION in family-friendly neighborhood. Meticulously built by reputable Needham builder. Designed with architectural detail and high-end finishes throughout, this home delivers both elegance and everyday functionality. The main level features a versatile floor plan ideal for modern living and entertaining, including a chef’s kitchen with full butler's pantry, formal dining room, family room, full bath and first floor bedroom or home office. The second level features a primary suite with a private bath and walk in closet, along with three additional bedrooms, two full baths and laundry room. The finished lower level offers 9 ft ceilings, A/C, a large kitchenette area, full bath, and plenty of space perfect for a private theatre, a game room AND gym area. Fenced yard, town water/sewer. Private showings.— Bertone Realty, Inc.

Key details

  • 5,300 sq ft
  • 10,200 lot sq ft
  • 5 beds
  • 5 baths
  • 2026 built
  • $527 / sq ft
MLS #
7⁠3⁠5⁠2⁠0⁠2⁠2⁠5⁠
Last updated
Address
18 Avon Circle
Town
Needham, MA
ZIP
02494
Deed (Bk/Pg)
36973 / 231

Map

Neighborhood: Needham

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.