Skip to main content

Listing broker remarks

Over 2,350 sq ft of living area on a picturesque dead-end Natick street near Nonesuch Pond and Rivers School. Move in as-is or build instant equity with a few cosmetic finishing touches. The main level features a front-to-back living room, a formal dining area, enclosed sunroom and first floor bath with laundry. Upstairs are four bedrooms, including a primary suite with a full bath and a large walk-in closet. The fully owned solar panels and high-efficiency heat pump mini-splits translate to major utility savings. A partially finished walk-out lower level offers an ideal space for a gym, office or bonus room. Outdoors, enjoy a fully fenced backyard with a custom firepit, patio, and shed. This home offers an incredible opportunity in a beautiful part of Natick!— Board and Park

Key details

  • 2,354 sq ft
  • 5,850 lot sq ft
  • 4 beds
  • 2.5 baths
  • 1960 built
  • $356 / sq ft
  • $8,414 2025 taxes
MLS #
7⁠3⁠5⁠2⁠4⁠4⁠8⁠7⁠
Last updated
Address
6 Hovey Ave
Town
Natick, MA
ZIP
01760
Deed (Bk/Pg)
68186 / 305

Map

Neighborhood: Natick

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.