Skip to main content

Listing broker remarks

New construction—move-in July! Now introducing Phase 3, the final release at Sandpiper Place II. This 4BD/4.5BA Reef home features high-end finishes throughout, including wide-plank hardwood floors, custom millwork, and a chef’s kitchen with premium appliances, upgraded countertops, and custom cabinetry. The open-concept layout is ideal for entertaining. The finished lower level offers a great room, additional bunk room, full bath, and optional kitchenette. Sandpiper Place II is a 36-home community just ~2 miles from Nantucket Town with easy access to beaches. Amenities at The Landing clubhouse include a heated pool, fire pit, outdoor kitchen, putting green, fitness center, and indoor/outdoor gathering spaces. Showings by appointment with 24-hour notice. Furnished option available. Images may reflect model home.— JD Advisors, Inc

Key details

  • 3,793 sq ft
  • 4,511 lot sq ft
  • 4 beds
  • 4.5 baths
  • 2026 built
  • $850 / sq ft
  • HOA a
MLS #
7⁠3⁠4⁠9⁠5⁠6⁠4⁠0⁠
Last updated
Address
5 Goldenrod Court
Town
Nantucket, MA
ZIP
02554

Map

Neighborhood: Nantucket

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.